Gantry crane and overhead crane products Index> Products> Gantry crane and overhead crane products


400+400t Overhead Crane (Load Test) of Jinping HPP in China

2 x 2500kN Overhead Crane of Three Gorges HPP in China



400t+400t Power House Overhead Crane (Rotor Lifting) of An'gu HPP in China

800KN Overhead Crane of Ship Lift of Xiangjiaba HPP in China

300t Overhead Crane of Shawan HPP in China

Overhead Crane of Tian'an HPP in China

Overhead Crane of Dahua HPP in China



300t Power House Overhead Crane of Baozhusi HPP in China


Overhead Crane (Static Load Test) of Dongqing HPP in China


Temporary Overhead Crane for Ship Compartment of Three Gorges HPP in China

63t Overhead Crane for Repairing inside Engine Room of Three Gorges HPP in China




List of Overhead Cranes
NO. Product Span (m) Span (m) Q'ty Project FinishTiame
1 2*32t overhead crane 45/15 19 1 Jiangxi Wanan Hydropower Station 1986
2 100/20t overhead crane 20/22 16 1 Gong mouth hydropower station in sichuan province
1994
3 300/80/10t overhead crane 23/28/30 21 2 Sichuan Province at baozhusi hydropower station 1995
4 100/20t overhead crane 45/55 22.5 1 Guangxi Natural Bridge Hydropower Station 1997
5 100/20t overhead crane 15/15.5 6 1 Iran Maschede Soliman Hydropower Station 1999
6 325/80/10t overhead crane 30/40 16.8 1 Iran Maschede Soliman Hydropower Station 1999
7 125/32t overhead crane 16/22 17 1 Sichuan Tongzhong Hydropower Station 2000
8 320+320/80/10t overhead crane 28/45/48 21 1 Wujiang Guizhou expansion project 2002
9 160/50/10t overhead crane 33/33/42 18.7 1 Qinghai water power station 2002
10 350+350/80/10+10toverhead crane 26/26/40 21 1 Guizhou cable wind power station 2003
11 200+200/50/10+10t overhead crane 30/30/35 22.5 1 Inner Mongolia Nierji water project 2003
12 300+300t overhead crane 28 21 1 Transformation of Wujiang Guizhou Hydropower Station 2003
13 250+250/50/10t overhead crane 26/26/32 23.2 1 Tai'an Shandong pumped storage power station 2003
14 400/100/10t overhead crane 27/35/48 20 2 Hunan three board Creek Hydropower Station 2003
15 420/50/10t overhead crane 26.5/27.8 24 1 Hengyang Hunan large terminal 2004
16 160t overhead crane 23/27/32 19.5 1 Tibet Hydropower Station 2004
17 260/90t overhead crane 24/27 23.5 2 Sultan Merowe hydropower project 2005
18 350+350/50/15t Double trolley overhead crane 34/34/40 27 2 Pengshui Chongqing power station 2005
19 160+160/40+40/10t Double trolley overhead crane 32/40/44 21 1 Hunan Guayeshui water power station 2006
20 200+200/40t Double trolley overhead crane 42 20 1 Yunnan Golan Beach 2006
21 300+300/50/10t Double trolley overhead crane 35/35/43 19.5 1 Guizhou Dongqing Hydropower Station 2008
22 300/50/10t Double trolley overhead crane 26 24.5 2 Sichuan Shawan Hydropower Station 2008
23 300+300/25+25/10t Double trolley overhead crane 64/60/67 28 1 Guangxi expansion project 2008
24 200/50/10t Single trolley overhead crane 19/21/30 15.5 2 The renovation project of Hunan Zhexi Hydropower Station 2009
25 180t/50t/2*10t-14.8 Single trolley overhead crane 24/26/30 14.8 1 Kampuchea Gan Hydropower Station 2009
26 400+400/160t Double trolley overhead crane 32 25.2 2 Jinping Sichuan Hydropower Station 2010
27 200/50t+200/50t/10t Double trolley overhead crane 26/26/32 22.2 1 Sichuan Mao er Hydropower Station 2010
28 125t/50t Single trolley electric overhead crane 44/47 17.5 1 Laos south Russia 5 power station 2010
29 150/50/10t-14.0m,Station is A3 type single hoist bridge crane
25/30/30 14 1 Guodian Xinjiang Yili Kashi River hydropower station, Richter 2011
30 Ship room 125t/2*16t temporary overhead crane 35/35 24.2 1 Yangtze River Three Gorges Project 2011
31 160t/50t/10t overhead crane 22/24 17.5 1 Gabon Baja large hydropower project 2011
32 180/50/10t Single trolley electric overhead crane in power house 22/24/30 17 1 Xinjiang Yili water power station Tayi qurush 2011
33 250/63/2*10t Single trolley electric overhead crane in power house 30/30/36 20.5 1 Xinjiang Kaidu Liushugou Hydropower Station 2012
34 QE180+180/50+50/10t power house overhead crane 30/40 21 1 Buerjin Xinjiang Mountain Hydropower Station 2012
35 motor room 63t/2*16t maintenance overhead crane 12/157 18 2 Yangtze River Three Gorges Project 2012
36 ship lift upper part gate 2*250t overhead hoist 80 34 1 Yangtze River Three Gorges Project 2013
37 ship lift upper part gate 2*250t overhead hoist 72 34 1 Yangtze River Three Gorges Project 2013
38 Ship lift room 80t/2*16t overhead crane 160/16-42 42 1 Xiangjiaba Hydropower Station 2013
39 400+400/160t Double trolley overhead crane 53/36-26 26 1 Engineering Angu hydropower station of Dadu River 2013
40 125+125t Double trolley overhead crane 30/35-16.5 16.5 1 Tibet fruit and Hydropower Station 2014
41 200/50/10t mian power house  electric double beam lifting overhead crane 35-20.5 20.5 1 Congo golden II ZONGO Hydropower Station Project 2014

 
 
Product classification
International business
Gantry crane and overhead crane products
Hoist products
Metal structure products
Ship lift
Cable crane
Non hydropower business
Electrical equipment installation and commissioning
After sales and maintenance services
Structure and equipment installation
Connect with us

Address: No.40, Xihe Road, Jiajiang County, Sichuan Province, China
TEL: +86-28-87777561 / +86-28-89993380
FAX: +86-28-87797721
E-mail: jhmc_hwsyb@163.com
Post code: 614100
Website: www.jhmw.com

 
 
HOME   |   ABOUTE   |   PRODUCTS   |   CONTACT
Copyright@2015SINOHYDRO JIAJIANG HYDRAULIC MACHINERY COMPANY LIMITED.All rights reserved.
XML 地图 | Sitemap 地图