Metal structure products Index> Products> Metal structure products


Radial Gate of Ghazi Barotha HPP in Pakistan

Radial Gate for Xiaowan HPP in China

Reverse Radial Gate for Three Gorges HPP in China

Bottom Outlet Radial Gate for Guangxi Longtan HPP in China

Radial Gate for Jiudanxia HPP in China

Reverse Radial Gate (Painted) for Three Gorges HPP in China

Spillway Radial Gate for Qiapuyihai HPP in China


Radial Gate for Sichuan Jingping 1st level HPP in China


Radial Gate for Sichuan Xiluodu HPP in China


Radial Gate for Son La HPP in Vietnam

Radial Gate for Yunnan Nuozhadu HPP in China


Radial Gate for Diversion Tunnel of Xiaowan HPP in China


Radial Gate for Pubugou HPP in China


Radial Gate Slot for Pubugou HPP in China


Radial Gate for Son La HPP in Vietnam


Radial Gate (Installation) of Shawan HPP in China


Radial Gate for Shenxigou HPP in China


Radial Gate for Sichuan Xiluodu HPP in China


Radial Gate for Sichuan Jingping 1st level HPP in China


Spillway Radial Gate for Lei reventazon HPP in Costa Rico


Radial Gate for Guangxi Tianshengqiao HPP in China


Radial Gate (installed) of Hubei Gaobazhou HPP in China


Radial Gate for Yunnan Dachaoshan HPP in China


Reverse Radial Gate (Installation) of Three Gorges HPP in China


Radial Gate for Gansu Xiaoxia HPP in China


Radial Gate for Sand Flushing of Yunan Malutang HPP in China


Radial Gate for AITEK HPP in Kazakhstan


Spillway Radial Gate for Daoyekan HPP in Burma



Radial Gate for Longyangxia HPP in China


Reverse Radial Gate for Ship Lock of Gezhouba HPP in China


Radial Gate for Yunan Lubuge HPP in China


Radial Gate for Yunnan Manwan HPP in China


Radial Gate for Ankang HPP in China


Spillway Radial Gate of Hubei Qingjiangge Heyan HPP in China


Radial Gate for Sichuan Baozhusi HPP in China


Radial Gate for Baozhushi HPP in China


Radial Gate for Ghazi Barotha HPP in Pakistan


Radial Gate of Hubei Gaobazhou HPP in China



Radial Gate List
No. Product 0rifice Size
(width * height) (m)
Design Water Head (m) Radius Of Curvature (m) Q'ty Project Finish Time Running Situation Remark
1 middle hole arc gate 16*9.5 14.5 5 Yuxi Sichuan River Hydropower Station 1975 Good
2 reverse arc gate of 1# lock 5*6 24 8 4 Gezhouba Dam Hubei two 1984 Good
3 right dam outlet arc gate 7.5*7 74 14.5 2 Yunnan Rube case 1985 Good
4 deep hole arch 8.5*13.5 90 1 Longyangxia Qinghai power station 1987 Good
5 the sand bottom working radial gate 3.5*3.5 90.5 8.8 1 Yunnan Manwan Hydropower Station 1989 Good Pressurized Water Seal
6 bottom arc gate 4.5*8 75 16 2 Qingjiang Hubei Hydropower Station 1991 Good
7 reverse arc gate of lock emptying corridor 2.6*2.6 41.7 4 8 Fujian Shuikou Hydropower Station 1991 Good
8 right bottom hole arc gate 4*8 80 16 2 Sichuan Baozhusi Engineering 1995 Good PressurizedWaterSeal,Arc Processing
9 a radial gate 18.3*7.8 8 10 20 Pakistan Gez and Ballotta Engineering 1998 Good
10 lock gate two three four five 4.2*4.5 45.2 7 16 Hubei Three Gorges Project 2001 Good
11 deep hole outlet gate 7*9 85 16 12 Hubei Three Gorges Project 2001 Good Arc Processing
12 deep outlet arc gate 5.5*5.5 80 10.5 1 Xinjiang qiafuqihai water control 2003 Good Pressurized Water Seal,ArcProcessing
13 sand discharging hole arc gate release flood waters 5.4*7.8 105 16 2 Sichuan Zipingpu Water Conservancy Project 2004 Good Arc Processing
14 sand flushing empty arc gate 3.0*3.0 120 9 1 Sichuan Zipingpu Water Conservancy Project 2004 Good Pressurized Water Seal,Arc Processing
15 bottom arc gate 5*8 110 16 2 Guangxi Longtan Hydropower Station 2006 Good arc processing
16 bottom outlet arc gate 6*7 110 12 2 The Xiaowan Hydropower Station in Yunnan 2006 Good pressurized water seal,arc processing
17 right dam outlet arc gate 5*5 92 8 1 Gansu nine Gorge Hydropower Station 2007 Good
18 outlet arc gate 5*5.5 88 12.8 1 Xinjiang state power Kaidu River
Chahanwusu Hydropower Station
2007 Good
19 middle hole outlet gate 6*7 120 12 3 The Xiaowan Hydropower Station in Yunnan 2007 Good Pressurized Water Seal,Arc Processing
20 emptying bottom outlet gate 5*7 160 15 2 The Xiaowan Hydropower Station in Yunnan 2007 Good Pressurized Water Seal,Arc Processing
21 emptying bottom outlet gate 6.5*8 126.28 17 1 Pubugou hydropower station of Sichuan 2008 Good Pressurized Water Seal,Arc Processing
22 bottom outlet gate 6*9.6 72.83 17.5 12 Vietnam Luoshan Hydropower Station 2008 Good Arc Processing
23 middle outlet gate 6*6.5 90.4 12 6 The Xiaowan Hydropower Station in Yunnan 2008 Good Pressurized Water Seal,Arc Processing
24 bottom outlet gate 5*5.5 88 12.8 1 Xinjiang Kalasuke water conservancy project 2008 Good Pressurized Water Seal,Arc Processing
25 right outlet gate 5*8.5 126 15 2 Nuozhadu Hydropower Station 2009 Good Pressurized Water Seal,Arc Processing
26 5# outlet tunnel gate 6*8 80 16 1 Nuozhadu Hydropower Station 2009 Good
27 bottom hole outlet gate 5*9 110 13 5 Jinping Sichuan Hydropower Station 2010 Good
28 left dam outlet gate 5*9 103 15 2 Nuozhadu Hydropower Station 2010 Good Pressurized Water Seal,Arc Processing
29 right double outlet middle hole arc gate 5*9 89 15 2 Guanyin yan Hydropower Station 2010 Good
30 spilway control gate 12*9.5 9 12 1 Blackwater River Sichuan Maoergai hydroelectric power station 2010 Good
31 outlet empty gate 4.3*4.1 100.62 9.5 1 Blackwater River Sichuan Maoergai hydroelectric power station 2010 Good Arc Processing
32 spilway arc gate 13.2*18.917 15 6 Anne Si La Chile 2011 Good
33 spilway arc gate 14*12 65 23 4 Jinsha River Xiluodu Hydropower Station 2011 Good
34 spilway arc gate 10*12 12.924 18 5 Burma Daoyekan two hydropower station 2011 Good
35 spilhole arc gate 8*14.1 13.646 16 1 Xinjiang state power Kaidu Liushugou Hydropower Station 2011 Good
36 emptying bottom outlet gate 5*6 131 12 2 Jinping Sichuan Hydropower Station 2011 Good Pressurized Water Seal,Arc Processing
37 deep hole arc gate of outlet system 6*7 104 14 8 Jinsha River Xiluodu Hydropower Station 2011
2012
Good
38 deep hole control gate 5*6 91 12 5 Jinping Sichuan Hydropower Station 2012 Good Pressurized Water Seal,Arc Processing
39 spiway gate 13*10.5 55 23 1 Jinping Sichuan Hydropower Station 2012 Good
40 spilway??outlet??arc gate 7.5*6 80 13 1 Xinjiang state power Kaidu Liushugou Hydropower Station 2012 Good
41 surface hole arc gate of outlet syetem 12.5*14.4 13.845 16 7 Jinsha River Xiluodu Hydropower Station 2012 Good
42 spilway arc gate 15*9.5 9 10 8 MATALAAngola MATALA 2012 Good
43 surface hole gate 11*13 12.456 14 5 Jinping Sichuan Hydropower Station 2013 Installation
44 spilway arc gate 12*15 41 20 3 Pakistan - runilamu killam Hydropower Station 2014 Manufacturing
45 outlet sand flushing gate leaves 12*16 15 10 13 Angu hydropower station of Dadu River 2013 Installation
46 low discharge arc gate 6*7.5 135.94 11.2 2 Pakistan tower Bella 4th Hydropower Station 2014 Manufacturing
47 sand flushing bottom outlet radial gate 4.3*4.3 89 7.5 1 Costa Rica Lei reventazon hydropower project 2015 Manufacturing
48 spilway arc gate 13.15*18.5 18.5 17 4 Costa Rica Lei reventazon hydropower project 2015 Manufacturing
49 1# the empty outlet radial gate 5*6 76 11 1 Xinjiang carabeli water conservancy project 2015 Manufacturing
50 2# the empty outlet radial gate 4.5*4.5 78 8.5 1 Xinjiang carabeli water conservancy project 2015 Manufacturing

 
 
Product classification
International business
Gantry crane and overhead crane products
Hoist products
Metal structure products
Ship lift
Cable crane
Non hydropower business
Electrical equipment installation and commissioning
After sales and maintenance services
Structure and equipment installation
Connect with us

Address: No.40, Xihe Road, Jiajiang County, Sichuan Province, China
TEL: +86-28-87777561 / +86-28-89993380
FAX: +86-28-87797721
E-mail: jhmc_hwsyb@163.com
Post code: 614100
Website: www.jhmw.com

 
 
HOME   |   ABOUTE   |   PRODUCTS   |   CONTACT
Copyright@2015SINOHYDRO JIAJIANG HYDRAULIC MACHINERY COMPANY LIMITED.All rights reserved.
XML 地图 | Sitemap 地图